• Home
  • Nation
  • Politics
  • Business & Economy
    • Education
  • Health
  • Culture & Entertainment
    • Arts & Life
  • World
    • World Business
  • Perspectives
  • Sport
New Citizen
  • Home
  • Nation
  • Politics
  • Business & Economy
    • Education
  • Health
  • Culture & Entertainment
    • Arts & Life
  • World
    • World Business
  • Perspectives
  • Sport
No Result
View All Result
  • Home
  • Nation
  • Politics
  • Business & Economy
    • Education
  • Health
  • Culture & Entertainment
    • Arts & Life
  • World
    • World Business
  • Perspectives
  • Sport
No Result
View All Result
New Citizen
No Result
View All Result
Home Nation

I’ll complete abandoned Kabala Costain link road project – Uba Sani

NEW CITIZEN by NEW CITIZEN
March 12, 2025
in Nation
A A
0
I’ll complete abandoned Kabala Costain link road project – Uba Sani
Governor Uba Sani has flagging off the commencement of the Kabala Costain to Aliyu Makama link dual carriage road

Governor Uba Sani has flagging off the commencement of the Kabala Costain to Aliyu Makama link dual carriage road

0
SHARES
5
VIEWS
Share on FacebookShare on TwitterShare on WhatsappShare on Telegram
Governor Uba Sani flagging off the completion of the Kabala Costain to Aliyu Makama link dual carriage road

Governor Uba Sani has flagged off the commencement of the Kabala Costain to Aliyu Makama link dual carriage road in the Kaduna metropolis that was abandoned by the previous administration after 30% of the project was completed.

The governor, who performed the ceremony near the Kabala Costain link bridge today, said his administration has already mobilised the contractor to ensure that the remaining 70% of the project is completed in record time.

‘’This road is a vital artery that will connect the vibrant communities of Kaduna South to Kaduna North Local Government Areas,’’ he said, adding that the project is more than an infrastructure, but a lifeline, channel for commerce and a pathway to opportunity.

According to him, the road will also serve as an alternative route for long distance travellers in the event of traffic congestion on other roads, thereby enhancing ‘’easy movement for those traveling from the north-eastern and north-western parts of the country to the Federal Capital Territory and beyond.’’

The governor amidst a crowd at the project site

The governor recalled that he had promised the people of Kaduna State to construct 50 kilometres of road in all the 23 local governments during his campaign tour as candidate of the All Progressives Congress (APC).

He said: ‘’In the past twenty months, our administration has initiated over 78 road projects across Kaduna State, covering a total of approximately 775 kilometres. These projects are not just numbers; they represent the dreams and aspirations of our people.

‘’On December 24, 2024, we commissioned 21 of these road projects. We are steadily fulfilling our promises to the good people of Kaduna State.

“We are simultaneously transforming rural and urban poor communities that have often been overlooked.

“We understand that infrastructure is the backbone of development, and we will continue to prioritise projects that uplift our citizens and improve their quality of life.”

Governor Uba Sani inspecting the road project site

Uba Sani praised the people of the state for the prevailing peace, adding that the state has not experienced any ethno-religious crisis in the last 22 months.

He emphasised the nexus between peace and development, adding that there cannot be development without peace in any society.

In his welcome address, the Managing Director of the Kaduna State Roads Agency, Dr Abdullahi Baba Ahmed, disclosed that outstanding debts related to the completed portion of the Kabala Costain to Aliyu Makama dual link road road totalled N2.2 billion.

He announced that Governor Uba Sani ‘’has already approved and mobilised the contractor with more than half or 50% of the funds to complete this great project.’’

According to him, one of the primary reasons the previous administration abandoned the project in December 2022 was the significant geological challenges encountered during the construction phase.

Governor Uba Sani on a caterpillar truck at the road project site

He said: ‘’Soil investigations revealed that just beyond the existing bridge, they were faced with extremely poor soil conditions compounded by the heap of waste deposited by nearby streams and tributaries. This unsuitable material posed a serious threat to the structural integrity of the road.

‘’To address these issues, there are two main options: either extending the dual carriage bridge by 180 meters or stabilise the soil by excavating to a depth of six meters, which is roughly equivalent to a 2-storey building.

‘’This second option required specialised machinery to excavate the unsuitable soil and replace it with imported boulders in layers —a task that is both complex and resource-intensive. Unfortunately, due to these challenges, the project was left in limbo.

‘’However, I am proud to say that under the leadership of our able governor, Senator Dr. Uba Sani, we are taking the bull by the horns and moving forward with this important project.

‘’The governor has ensured that the contractors, Messrs CCECC Nigeria Limited, are adequately mobilised with the necessary resources to overcome these challenges.’’

Tags: Governor Uba SaniKabala Constain link roadKaduna StateMessrs CCECC Nigeria Limitedroad project
Previous Post

US steered Syrian Kurds towards Damascus deal, sources say

Next Post

History will judge Tinubu favourably – Idris

Related Posts

Nation

Aminu Ala: A Tribute To A Mystical Poetic Maestro

November 9, 2026
Nation

Court sacks David Mark-led ADC leadership, voids Atiku’s presidential primary

November 5, 2026
Tinubu departs Saudi Arabia for Abuja after completing Umrah
The Deputy Governor of the Makkah Region, Prince Saud bin Mishaal bin Abdulaziz Al Saud; Nigeria's Ambassador to Saudi Arabia, Yakubu Gambo; the Consul-General, Muazam Ibrahim Nayaya, and other dignitaries accompany President Bola Ahmed Tinubu and his entourage at the airport in Jeddah today
Nation

Tinubu departs Saudi Arabia for Abuja after completing Umrah

November 4, 2026
Photos: 8th Tozali Henna Ball and People’s Awards
Nation

Photos: 8th Tozali Henna Ball and People’s Awards

November 2, 2026
Tinubu reaffirms commitment to Nigeria after praying inside Ka’abah
President Bola Tinubu praying at the Ka'abah in Mecca
Nation

Tinubu reaffirms commitment to Nigeria after praying inside Ka’abah

November 2, 2026
Tinubu embarks on Umrah, prays for Nigeria, returns next week
President Bola Ahmed Tinubu departs the Nnamdi Azikiwe International Airport in Abuja today
Nation

Tinubu embarks on Umrah, prays for Nigeria, returns next week

October 29, 2026
Next Post
History will judge Tinubu favourably – Idris
The Minister of Information and National Orientation, Mohammed Idris, delivers his address on the occasion

History will judge Tinubu favourably – Idris

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Aminu Ala: A Tribute To A Mystical Poetic Maestro
  • Court sacks David Mark-led ADC leadership, voids Atiku’s presidential primary
  • Tinubu departs Saudi Arabia for Abuja after completing Umrah
  • Photos: 8th Tozali Henna Ball and People’s Awards
  • Tinubu reaffirms commitment to Nigeria after praying inside Ka’abah

Recent Comments

No comments to show.

Recent Posts

  • Aminu Ala: A Tribute To A Mystical Poetic Maestro
  • Court sacks David Mark-led ADC leadership, voids Atiku’s presidential primary
  • Tinubu departs Saudi Arabia for Abuja after completing Umrah
  • Photos: 8th Tozali Henna Ball and People’s Awards
No Result
View All Result
  • Home
  • Nation
  • Politics
  • Business & Economy
    • Education
  • Health
  • Culture & Entertainment
    • Arts & Life
  • World
    • World Business
  • Perspectives
  • Sport

© 2024 New Citizen

error: Content is protected !!